SRA Annual Report 2022-23: Taunton Strategic Flood Alleviation Improvements Scheme (TSFAIS)

The main purpose of Taunton Strategic Flood Alleviation Improvements Scheme (TSFAIS) is to reduce flood risks to 1,031 properties arising from the River Tone and its complex network of tributaries. TSFAIS has been part-funded by the SRA since 2016. In 2016-17, the SRA contributed Growth Deal funding from the Heart of the South West Local Enterprise Partnership.

During 2022-23, two initial TSFAIS projects were led by Somerset West and Taunton Council (SWTC; since 1 April 2023 Somerset Council) and the Environment Agency.

1. River Tone Left Bank Flood Defences – raising low spots from Frieze Hill to Town Bridge. During 2022-23, contractors Binnies completed numerous studies and surveys and began designing improved flood defences. A planning application is expected by December 2023.

2. Raise Firepool Lock gates and build up to 750 metres of River Tone flood defence, from Firepool Lock to the A358 Obridge Viaduct. In spring 2022, consultants WSP completed a range of studies, then in summer 2022 a public consultation was held about the proposed flood defence alignment, landscaping and ecological mitigation. In response to people’s comments, WSP then amended designs where possible. A planning application is expected by December 2023.

Back To Top