SRA Annual Report 2020-21: New Highbridge pumping station
Work was completed in autumn 2020 on a £1.8million Wessex Water scheme designed to protect 21 homes in Field Way, Highbridge from very unpleasant sewer flooding.
A new surface water pumping station was installed, along with new pipework. Pictured below: the Highbridge pumping station being built.
Somerset Rivers Authority (SRA) part-funded this scheme, using £100k of its Growth Deal funding from the Heart of the South West Local Enterprise Partnership.