SRA Annual Report 2022-23: Chadmead

In summer 2022, a 13-metre section of the track that connects Northmoor Corner and Kitches Lane in Chadmead was levelled and surfaced.

Verge marker reflector posts were then installed, to warn drivers off veering into Bankland stream.

Stream, green bank, three verge reflectors, a stretch of resurfaced tracheostomy's, a hedgerow.
Resurfaced Chadmead track with verge reflectors.

These two jobs were delayed from the year before because of coronavirus pandemic complications.

Their SRA-funded completion marked the end of a one-off Somerset County Council’s Rights of Way Department project to preserve vehicular access to and from Chadmead in times of flood.

Local thanks have been received.