A scheme to reduce flooding along Robins Lane in Burtle, which has a long history of problems caused by two undersized culverts and a dilapidated roadside ditch.

Environmental surveys of the site were completed in summer 2024.

Work on a detailed design began in February 2025, led by the Axe Brue Internal Drainage Board as a partner in the SRA.