SRA Annual Report 2025-26: Bridgwater Tidal Barrier

Bridgwater Tidal Barrier will reduce flood risks for over 11,300 homes and 1,500 businesses.

It’s a project led by the Environment Agency and Somerset Council, with contributions now totalling £3.37 million from the SRA and the old Heart of the South West Local Enterprise Partnership. These contributions particularly helped to accelerate the project’s early development. It has three main elements:

  • a Tidal Barrier across the River Parrett between Express Park and Chilton Trinity
  • 4.3 kms (2.67 miles) of new flood defence banks and 2.8 kms (1.74 miles) of raised banks at Chilton Trinity, Combwich and Pawlett
  • fish and eel passes at up to 12 sites upstream of the barrier

Extensive progress was made in 2025-26. Activities included:

  • as part of a Design Efficiency Review, simplifying the Barrier’s superstructure, which still incorporates three sculptural towers and two vertical lift gates
  • with the aid of a huge jack-up barge, constructing a cofferdam, that is an enclosure pumped dry to allow for works below water level
  • completing the installation of tubular piles for the Barrier’s foundations
  • completing the bypass channel needed so the Parrett can still flow around the cofferdam while further works take place
  • working on outfall structures, embankments, piling mats, culverts and haul roads around Chilton Trinity and Pawlett
  • archaeological works, community drop-ins, school and college visits, sessions with local businesses
The Parrett’s bypass channel flowing round the cofferdam.
Piling mat construction at Chilton Trinity.