Sections in SRA End of Year Report 2016-17

The End of Year report covering Somerset Rivers Authority’s work in 2016-17 is divided up into the sections listed below.

Use the links in blue below to read different sections, or get a PDF of the Somerset Rivers Authority End of Year Report 2016-17 (21 pages – 1.8MB).

1 Introduction

2 Performance

Includes
– Delivery: Summary
– Delivery: By Funding Source
– Finance: Summary by Funding Source

3a Progress of Works in Detail – Key Projects

Includes
– Dredging
– Sowy/King’s Sedgemoor Drain (KSD) enhancement
– Bridgwater Tidal Barrier
– Taunton Strategic Flood Alleviation Improvements Scheme

3b Progress of Works in Detail – SRA 2016-17 Enhanced Programme

Dredging & River Management – Workstream 1
Land Management – Workstream 2
Urban Water Management – Workstream 3
Resilient Infrastructure – Workstream 4
Building Local Resilience – Workstream 5

Back To Top